Boise’s 2017 “Snowpocalypse” Devastates Historic Downtown Building
On a Sunday evening, a sprinkler pipe in the attic of a 7-story commercial building in downtown Boise failed, flooding all seven stories. CTR arrived at the site soon after being notified of the flood, and began identifying affected structure and contents on each floor. Contents were moved from affected areas, and within two days, almost 400 pieces of drying equipment had been strategically placed for effective drying. Within two weeks, the entire structure had been dried, and within four months, all repairs were complete. The customers were highly satisfied with CTR’s performance.
Hospital Severely Impacted by Flooding
A Boise hospital facility received significant damage due to a failure in the sprinkler system. Six patients had to be relocated. During the initial stages of the water damage investigation, significant mold was discovered related to previous water accidents. Containment of each room was employed, and a mold treatment protocol was established. After completion of drying and mold clean-up, an independent hygienist tested and verified air quality. Less than a month after the initial call to CTR, all repairs were completed, and the rooms were ready for the patients to return.
Upscale Apartments Impacted by Mold
An upscale apartment complex had a hidden defect in its mechanical system when the units were installed. The defect caused a slow leak that was not visible until mold presented itself in some of the units. CTR contracted with the owner to work through the remediation process after the defect, and related damage was diagnosed.
With the assistance of multiple vendors, and pre- and post-testing by an indoor environmental professional, CTR was able to successfully remediate all affected units and the tenants’ personal property.
On Sunday evening, a valve failed in the main water line, located in the ceiling of the clinic, which caused the line to fail in two areas.
Most of the rooms in the clinic were affected. Some contained very expensive equipment. The equipment was protected with plastic coverings and containment in the rooms to keep dust to a minimum while drying. Several built-in cabinets were affected.
Instead of initiating demolition of the cabinets, specialty equipment was used to dry them in place. Within a week the floors, walls, and ceiling had dried. Less than three months later, repairs had been completed and the clinic was able to re-open.
Devastating Fire Strikes Restauraunt
An electrical fire erupted in the middle of the night, creating substantial damage to the interior and exterior of the restaurant. After the fire was extinguished, CTR met with the owner, fire officials, and investigators to develop a plan to rebuild the restaurant. CTR worked efficiently with all parties to make sure the restaurant could be rebuilt as soon as possible to reduce business interruption.
After the fire investigation was complete and the site secured, CTR immediately began the process of demolition and clean-up, along with planning reconstruction with the owner and local building officials. Within a matter of months, the restaurant was re-opened ahead of schedule, to the satisfaction of the owners and customers. CTR celebrated the grand re-opening with the local Chamber of Commerce.